The diagonal checkerboard: two shades on the point
Geometric patterns · 5 min read · updated 5 November 2026 · Written by Tilelico
Turned by 45°, a checkerboard changes character: the tiles read as diamonds, and the floor seems less constrained by the walls. Every edge is cut on the slant, and the shades no longer necessarily split evenly.
When to choose it
It suits entrances and narrow rooms, where diagonal lines avoid emphasising the room’s shape.
- Best forRooms with walls not quite square, which the diagonal makes less visible.
- Avoid ifThe room is small and very broken up: slanted cuts become numerous.
Continue with: The checkerboard lay: two shades in alternation →
Preparing the job
Order by shade, with a higher margin than for a straight checkerboard: every edge is cut.
Choose the axis according to the room’s entrance, and check where the points land against the walls.
Continue with: Laying tile on a 45° diagonal: mark accurately, cut efficiently →
Step by step
- Step 1 — Mark the 45° axisStart from two square axes, then transfer the diagonal at equal distance on each.
- Step 2 — Dry-lay a diamond of four tilesCheck the shade at the centre and how it reads from the entrance.
- Step 3 — Work in stripsAdvance from the axis, keeping the two stacks of shades apart.
- Step 4 — Measure the slanted cutsTransfer each cut on site: the sheet is a guide.
- Step 5 — GroutFirst test the grout shade on an offcut of both tiles.
Continue with: Laying cement tile: layout, protection and grout →
Mistakes to avoid
- Splitting the order evenlyOn the diagonal, edges cut the shades differently: follow the quantity per shade.
- Marking the axis by eyeAn angle error shows all along the walls.
These pointers describe common practice, not imposed rules. The data sheet for your covering and for your installation products always takes precedence, and measurements taken on site are the reference.
Frequently asked questions
Is it the same as a cabochon lay?
No. The result recalls a cabochon, but here all tiles are the same size.
Is more margin needed?
Generally yes: compare the quantities with the straight checkerboard on your plan.
Read next
Technical references
This guide describes common installation practices. It does not replace applicable technical documents, manufacturer instructions or measurements taken on site.